From the first audit to a city-wide network
What a commune needs to plan, fund and roll out adaptive street lighting: the business case, the steps from inventory to pilot to roll-out, what to put in the tender and the money available in Luxembourg.
- Klimabonus subsidy for renovating public lighting
- 30%
- Klimabonus subsidy for renovating public lighting
- electricity saving the subsidy requires
- ≥ 40%
- electricity saving the subsidy requires
- yearly cut in public-body energy use under the EED
- 1.9%
- yearly cut in public-body energy use under the EED
- typical payback from energy savings alone*
- 3–5 y
- typical payback from energy savings alone*
*Lusety, across its municipal deployments.
Three reasons communes are moving now
An energy duty The recast Energy Efficiency Directive (EU) 2023/1791 requires public bodies to cut their combined final energy consumption by at least 1.9% a year compared with 2021. In Luxembourg, communes under 50,000 inhabitants count from 1 January 2027 and communes under 5,000 from 1 January 2030. Street lighting is part of every commune's electricity bill, and one of the easiest large savings in it. The rules in detail.
Funding Since 1 January 2026 the Klimabonus Gemengen pays 30% of the eligible cost of renovating public lighting, with a ceiling per lighting point and a €50 bonus per point where new luminaires are networked and dim by motion detection.
Lamps on their way out Mercury in sodium lamps is allowed only through RoHS exemptions that are running out, and spare lamps get harder to buy. Swapping lamps for LED roughly halves consumption. Adding control on top is what took Lithuanian municipalities to savings of 59–88%.
Savings stack up layer by layer
Annual energy use for an urban area with 6,000 luminaires, from sodium lamps to fully adaptive LED.
- sodium lamps
- 3,737 MWh
- sodium lamps
- LED street lights, −47%
- 1,970 MWh
- LED street lights, −47%
- LED with AstroDIM night dimming, −75%
- 933 MWh
- LED with AstroDIM night dimming, −75%
- adaptive LED with motion sensors, −92%
- 293 MWh
- adaptive LED with motion sensors, −92%
Source: Lusety deployment data, as shown on our home page. Percentages against the sodium baseline.
A commune with 2,000 LED luminaires
Take 2,000 LED luminaires of 60 W each, lit 4,200 hours a year, the operating time the Klimabonus uses in its calculations. They use 504 MWh a year. At an assumed €0.20 per kWh, that is about €100,800.
Controllers and motion sensors that cut consumption by 65%, close to the lower end of the Lithuanian results, save about 328 MWh and €65,500 a year. Maintenance comes on top: Lusety reports up to 20% lower maintenance costs across deployments, and up to 30% in a Kaunas park.
Your own figures depend on the luminaires, the tariff, the traffic and the lighting class of each street. We model them street by street before the council decides.
From audit to roll-out in seven steps
- 01
Inventory
Count every lighting point on communal roads and in public spaces: luminaire type, wattage, age, socket, pole and cabinet. Note which cabinets you share with the State and who maintains the network. The Klimabonus asks for this inventory.
- 02
Lighting concept
Decide which streets need light, and at what level: the EN 13201 lighting class of each street, colour temperature, the protected zones of the national good-lighting guide and the dark corridors of the trame noire. Some paths are better left dark.
- 03
Business case and funding
Model energy, maintenance and CO₂ per street, check the 40% saving the subsidy requires and file the Klimabonus application before you tender.
- 04
Pilot
Equip one street, park or cycle route with controllers and motion sensors, without rewiring. Consumption, faults and activity show on HORIZON from the first night, so the council sees real figures.
- 05
Tender
Specify open standards, metered consumption per luminaire, motion-based adaptive control and the security requirements in the checklist below.
- 06
Roll-out
Extend zone by zone on the same platform. Cabinet controllers bring the remaining circuits under remote control and metering.
- 07
Operate and report
Follow consumption per luminaire and per street, act on fault alerts and report the savings each year: to the Klimabonus monitoring, the Pacte Climat and the EED data collection.
Money available to communes
Conditions as published in November 2026. Check the current version before you apply.
Klimabonus Gemengen, fiche 6
30% of eligible costs, capped per original lighting point: €120 for a retrofit plate replacing a discharge lamp, €150 for a new luminaire, €300 for luminaire and pole, plus €50 per point when a new luminaire is networked and dims by motion detection. The installation must be at least 10 years old and the renovated points must use at least 40% less electricity. Apply before the works: no tender or order may be placed before the State decides.
Pacte Climat 2.0
Public lighting is one of the measures in the European Energy Award catalogue behind the Pacte Climat. Communes are certified at 40%, 50%, 65% or 75% of the maximum score and receive State support and climate-adviser hours. The Klimabonus is open to every commune, member or not.
ELENA, European Investment Bank
Covers up to 90% of project-preparation costs for investment programmes above €30 million. Public lighting is eligible, so it suits a syndicat de communes or several communes bundling their networks.
Energy performance contract
An investor or energy-service company funds the upgrade and is repaid from the measured savings. The Energy Efficiency Directive asks public buyers to check whether a long-term energy performance contract is feasible for energy-relevant service contracts. Lusety reports paybacks of 3 to 7 years in this model, depending on the age of the existing luminaires.
What to write into the specification
Requirements that keep the commune independent of any one supplier and make the savings measurable.
- A central management system certified by the TALQ Consortium, so controllers from other certified vendors can join later.
- Luminaire controllers and sensors on Zhaga Book 18 sockets with D4i, fitted without tools or rewiring.
- Energy metered per luminaire and per cabinet and reported in the platform, so savings are measured, not estimated.
- Motion-based adaptive control that restores the light automatically, which the Klimabonus requires for dimming to count.
- Lighting design to EN 13201-2, with the energy indicators PDI and AECI to EN 13201-5 for each street type.
- No upward light (0%, as in the EU green procurement criteria), colour temperature of 3,000 K or less, amber light in protected zones.
- Fault detection per luminaire, tilt and GPS data, and alerts with priority levels.
- Encrypted communication, two-factor login, role-based access and audit logs, plus an open API for other smart-city sensors.
- Local design, installation and after-sales support.
Who decides what
The collège des bourgmestre et échevins decides on switching off and dimming communal lighting, as the 2022 ministerial circular on public lighting recalls. Where a cabinet also feeds State roads, the commune first asks Ponts et Chaussées to check feasibility; separate control may need a smart meter and rewiring by the network operator.
Whenever the lights are on, the levels of ILNAS-EN 13201 and the ITM prescriptions apply, including at pedestrian crossings. Adaptive lighting works within these rules: it lowers the light on empty streets and brings the designed level back as soon as someone approaches.
Sources
- 1Directive (EU) 2023/1791 on energy efficiency (recast), Articles 5 and 7
- 2Circular 2025-035, Ministry of the Economy, 28 May 2025: EED transposition, public-sector data collection
- 3Klimabonus Gemengen, practical guide (Fonds climat et énergie), fiche 6: renovation of public lighting
- 4Circular 2025-050, Ministry of the Environment, 16 July 2025: Fonds climat et énergie, new regime from 1 January 2026
- 5Klima-Agence: Klimabonus Gemengen
- 6Circular 4182, 6 October 2022: energy savings and recommendations for public lighting
- 7Government of Luxembourg: Pacte Climat 2.0 (2021–2030)
- 8European Investment Bank: ELENA, European Local Energy Assistance
- 9Lusety: street-lighting modernisation without upfront capital (ESCO model)
- 10Lusety: smart urban lighting platform, figures and FAQ
More to read before you decide
Street-lighting rules
EN 13201, the Energy Efficiency Directive, ecodesign and mercury rules, and Luxembourg's guidance on light pollution.
ReadKaunas case study
A park, a cycling route, a residential area and the cabinet network of Lithuania's second city, on one platform.
ReadFAQ
Seventeen short answers for mayors, technical services and climate advisers.
ReadStart with one street
Tell us about the street, park or cycle route you have in mind. We survey it, model the savings, help with the Klimabonus application and run the pilot.